Construction Site Inspection Checklist



Save, fill-In The Blanks, Print, Done!

Click on image to zoom / Click button below to see more images
Adobe Acrobat (.pdf)

  • This Document Has Been Certified by a Professional
  • 100% customizable
  • This is a digital download (174.69 kB)
  • Language: English
  • We recommend downloading this file onto your computer.


  
ABT template rating: 8

Malware- and virusfree. Scanned by: Norton safe website

How to draft a Construction Site Inspection Checklist? An easy way to start completing your document is to download this Construction Site Inspection Checklist template now!

Every day brings new projects, emails, documents, and task lists, and often it is not that different from the work you have done before. Many of our day-to-day tasks are similar to something we have done before. Don't reinvent the wheel every time you start to work on something new!

Instead, we provide this standardized Construction Site Inspection Checklist template with text and formatting as a starting point to help professionalize the way you are working. Our private, business and legal document templates are regularly screened by professionals. If time or quality is of the essence, this ready-made template can help you to save time and to focus on the topics that really matter!

Using this document template guarantees you will save time, cost and efforts! It comes in Microsoft Office format, is ready to be tailored to your personal needs. Completing your document has never been easier!

Download this Construction Site Inspection Checklist template now for your own benefit!

Is sheet-flow runoff from drainage areas that exceed the design capacity of silt fence (generally 0.25 acre or larger) directed to a sediment pond Is runoff being collected and directed to the sediment pond via the storm sewer system or via a network of diversion berms and channels Is the sediment pond dewatering zone appropriately sized (67 cubic yards per acre of total drainage area) Is the sediment pond sediment settling zone appropriately sized (34 cubic yards per acre of disturbed area) Is the sediment basin designed to be dewatered at the surface through the use of a skimmer or another similar surface water dewatering device Is the sediment basin designed so that the dewatering zone will drain in no less time than 48 hours Have the embankments of the sediment pond and the areas that lie downstream of the pond been stabilized For sediment basins that dewater 100 between storms, is the riser pipe wrapped with chicken wire and double wrapped with geotextile fabric Does the riser have 1-inch diameter holes spaced 4 inches apart, both horizontally and vertically For sediment basins, which dewater 60 between storms, is the diameter of the dewatering hole per plan (see Chapter 6 of Rainwater manual) For sediment traps, is there geotextile under the stone spillway and is the spillway saddleshaped For sediment traps, which dewater 100 between storms, is the dewatering pipe end-capped, no larger than 6 inches in diameter, perforated and double-wrapped in geotextile Is the length-to-width ratio between inlet(s) and outlet at least 2:1 NOTE: If not, a baffle should be added to lengthen the distance..




DISCLAIMER
Nothing on this site shall be considered legal advice and no attorney-client relationship is established.


Leave a Reply. If you have any questions or remarks, feel free to post them below.


default user img

The only way around is through. | Robert Frost