Daily Status



Save, fill-In The Blanks, Print, Done!

Click on image to zoom / Click button below to see more images
Adobe Acrobat (.pdf)

  • This Document Has Been Certified by a Professional
  • 100% customizable
  • This is a digital download (1665.04 kB)
  • Language: English
  • We recommend downloading this file onto your computer.


  
ABT template rating: 7

Malware- and virusfree. Scanned by: Norton safe website

How to draft a Daily Status? An easy way to start completing your document is to download this Daily Status template now!

Every day brings new projects, emails, documents, and task lists, and often it is not that different from the work you have done before. Many of our day-to-day tasks are similar to something we have done before. Don't reinvent the wheel every time you start to work on something new!

Instead, we provide this standardized Daily Status template with text and formatting as a starting point to help professionalize the way you are working. Our private, business and legal document templates are regularly screened by professionals. If time or quality is of the essence, this ready-made template can help you to save time and to focus on the topics that really matter!

Using this document template guarantees you will save time, cost and efforts! It comes in Microsoft Office format, is ready to be tailored to your personal needs. Completing your document has never been easier!

Download this Daily Status template now for your own benefit!

INSPECTOR’S DAILY REPORTS This report should be used to give a daily detailed account of all activities occurring during the life of the project.. This would include members of the Division staff, Construction Unit, Materials and Tests representatives, Design Engineers, Federal Highway Administration representatives, city representatives, Design Engineers, Contractor s office representatives, and supplier s representatives.. A detailed description of each construction operation should consist of the Contractor s personnel involved, equipment used, hours worked (time work began to time work ended), location of the work, and the work performed.. Any delays in staking encountered: If the Contractor requests a bridge site be staked and upon arriving at the site it is discovered that the area is not sufficiently cleared, graded, etc., this should be documented along with the fact that the Contractor was informed of reasons the site could not be staked.. R-59 R-60 This page left blank intentionally R-61 R-62 R-63 Example 1 Inspector s Daily Report R-64 R-65 Example 2 R-66 R-67 Example 3 R-68 R-69 Example 4 R-70 R-71 Example 5 R-72 R-73 Tips for Writing Inspector’s Daily Reports                  Write daily reports each day..




DISCLAIMER
Nothing on this site shall be considered legal advice and no attorney-client relationship is established.


Leave a Reply. If you have any questions or remarks, feel free to post them below.


default user img

A successful man is one who can lay a firm foundation with the bricks others have thrown at him. | David Brinkley