Exception Report
Project:
CCAG – Manchester Road, Cheadle
Job No:
0249
Subject:
Stage 2 Safety Audit Exception Report
Date:
23
rd
July 2014
Introduction
Stockport MBC Crash Investigation Team undertook a Stage 2 Safety Audit for the above on the 9
th
July 2014.
The audit examined road safety implications associated with the CCAG cycle scheme on Manchester Road,
Cheadle..
The crash team identified 1 recommendation, the response to which is set out below.
Exceptions
in Safety
Audit Report
Accepted
(Yes/No)
Measure
Accepted
(Yes/No)
1 Yes No Although the route goes over Cheadle Bridge this element of
the works is being designed/constructed by Manchester City
Council. It is the Network Engineers understanding that
MCC will be providing a 0.5 metre buffer zone from the
parapet using hatched road markings. This will highlight to
cyclists not to ride adjacent the parapet.
Conclusions: -
None
Signed Mark James (Strategic Network Engineer)