HTML Preview Investigation Summary page number 1.


InvestigationSummaryReport
RMSId
2695
Year
2012
IncidentDate
02/04/2012
NotifiedDate
03/04/2012
FacilityName
BMGProjectNonProductionPhase
FacilityType
Environment Activity
IncidentCategory
EM‐Chemicalrelease
Summary
DuringtheBMGdeconstructionandwellinterventionprojectanunknownquantityof
transaquawasreleasedintothemarineenvironment.Thisoccurredduringhydraulic
valveactuation.Thequantityinvolvedwasbeyondwhatwas
describedintheEP
(greaterthan80L).TheuseofthisproductwasdetailedintheinforceEP.Transaquais
classifiedasanonCHARMableproduct.Theoperatorhasconfirmedthatan
investigationisunderwayandthatthevolumesinvolvedinthedischargewillbe
quantifiedandareportsubmitte d
toNOPSEMA.
Description
DuringtheBMGdeconstructionandwellinterventionprojectanunknownquantityof
transaquawasreleasedintothemarineenvironment.Thisoccurredduringhydraulic
valveactuation.ThequantityinvolvedwasbeyondwhatwasdescribedintheEP
(greaterthan80L).Theuseofthisproductwasdetailedinthe
inforceEP.Transaquais
classifiedasanonCHARMableproduct.Theoperatorhasconfirmedthatan
investigationisunderwayandthatthevolumesinvolvedinthedischargewillbe
quantifiedandareportsubmitte dtoNOPSEMA.
ImmediateCauses
Awaitingreport.
OtherVesselName
QtyofGas(kg)
VolumeofLiquid(litres)
Status
Closed
InitialDecisionReason
Lowpotentialorminorincidentornoinjury
InitialDecision NoFurtherActionwiththeInformationCurrentlyAvailable
ReasonNotes
Lownatureofimpactandlikelihoodofreoccurrencerenderfurtherinvestigationof
littlevalue.
BriefingNotes
BriefDescriptionTitle
ChemicalRelease(Transaqua)
EquipmentInvolvedName
Valves/Vents
OrganisationName
RocOil(VIC)PtyLimited
IncidentSubType
CriticalDecision
CriticalDecisionReason
CriticalDecisionIssues
CriticalDecisionOptions
CriticalDecisionRecomm:
Friday,14September2012 Page1of2
DOWNLOAD HERE


I don’t pay good wages because I have a lot of money; I have a lot of money because I pay good wages. | Robert Bosch