HTML Preview House Construction Format page number 1.


SAMPLE QUOTE FROM:
JOE THE BUILDER
PRICE QUOTE FOR: Steve & Jackie Homeowner
TO BE LOCATED AT: Lot X, Noplace Subdivision
Sometown, US
Description
Amount
Permits
$1,061.00
Excavation
$4,000.00
Septic System (Allowance)
$5,500.00
Termite Pre-treatment
$541.00
Concrete
$39,255.00
Gravel Driveway
$1,600.00
Framing
$58,266.00
Exterior Doors & Windows
$23,213.00
Fireplace
$2,400.00
Brick
$26,253.00
Cultured Stone
$975.00
Siding, Soffit, Gutters & Gutter Guards
$10,525.00
Plumbing
$8,170.00
Plumbing Fixtures (Allowance)
$5,897.00
Heating & Cooling
$15,655.00
Electric
$13,202.00
Electronics (Satellite, Antenna, Phone)
$2,134.00
Security System
$2,511.00
Lighting (Allowance)
$3,500.00
Mirrors & Accessories (Allowance)
$800.00
Insulation
$4,646.00
Drywall
$16,013.00
Paint
$12,292.00
Interior Trim & Doors
$17,338.00
Cabinets (Allowance)
$20,000.00
Carpet (Allowance)
$4,368.00
Ceramic Tile (Allowance)
$5,255.00
Hardwood (Allowance)
$8,192.00
Porch Columns & Posts
$1,147.00
Seed & Straw Yard (1 Acre Allowance)
$2,500.00
Clean, Clean up, Dump Runs & Final
$2,854.00
Subtotal
$320,063.00
Contractor's Fee
$32,006.30
Total
$352,069.30
PDF created with pdfFactory Pro trial version www.pdffactory.com
DOWNLOAD HERE


It is not the strongest of the species that survive, nor the most intelligent, but the one most responsive to change. | Charles Darwin