HTML Preview House Construction Format page number 1.


SAMPLE QUOTE FROM:
JOE THE BUILDER
PRICE QUOTE FOR: Steve & Jackie Homeowner
TO BE LOCATED AT: Lot X, Noplace Subdivision
Sometown, US
Description
Amount
Permits
$1,061.00
Excavation
$4,000.00
Septic System (Allowance)
$5,500.00
Termite Pre-treatment
$541.00
Concrete
$39,255.00
Gravel Driveway
$1,600.00
Framing
$58,266.00
Exterior Doors & Windows
$23,213.00
Fireplace
$2,400.00
Brick
$26,253.00
Cultured Stone
$975.00
Siding, Soffit, Gutters & Gutter Guards
$10,525.00
Plumbing
$8,170.00
Plumbing Fixtures (Allowance)
$5,897.00
Heating & Cooling
$15,655.00
Electric
$13,202.00
Electronics (Satellite, Antenna, Phone)
$2,134.00
Security System
$2,511.00
Lighting (Allowance)
$3,500.00
Mirrors & Accessories (Allowance)
$800.00
Insulation
$4,646.00
Drywall
$16,013.00
Paint
$12,292.00
Interior Trim & Doors
$17,338.00
Cabinets (Allowance)
$20,000.00
Carpet (Allowance)
$4,368.00
Ceramic Tile (Allowance)
$5,255.00
Hardwood (Allowance)
$8,192.00
Porch Columns & Posts
$1,147.00
Seed & Straw Yard (1 Acre Allowance)
$2,500.00
Clean, Clean up, Dump Runs & Final
$2,854.00
Subtotal
$320,063.00
Contractor's Fee
$32,006.30
Total
$352,069.30
PDF created with pdfFactory Pro trial version www.pdffactory.com
DOWNLOAD HERE


Every accomplishment starts with a decision to try. | Unknown