HTML Preview Daily Work Report page number 1.


LOCATION OF WORK
CHKENT
CEESQTY
CHK
FINAL
QUANTITY
UNITS
INTERIM
QUANTITY
ESFS
CONTRACT PAY
ITEM NO
MURK 1
(06/08)
DAILY WORK REPORT
CONTRACTOR WORK HOURS: TO
JOB STAMP
DWR No.
of
Sheet No.
DESCRIPTION OF WORK AND MATERIAL USED FOR EACH OPERATION, INCLUDING CONTRACTOR/SUB NAME, ITEM NO. AND LOCATION
AM PM
Weather
Temperature
W
Day of Week:
S M T T F S
Date:
I certify that the work described in this report was incorporated into this contract on the date of this DWR, unless otherwise noted.
Date Reviewed:
MURK 1-2 CONTINUATION attached for additional pay items & quantities.
MURK 1-1 CONTINUATION attached for additional narrative.
Reviewed by:
Date Prepared:
Inspector's Signature:
Engineer-in-Charge
Resident Engineer
DOWNLOAD HERE


The critical ingredient is getting off your butt and doing something. It’s as simple as that. A lot of people have ideas, but there are few who decide to do something about them now. Not tomorrow. Not next week. But today. The true entrepreneur is a doer, not a dreamer. | Nolan Bushnell