HTML Preview Equipment Performance Test page number 1.


LV EQUIPMENT PERFORMANCE TEST REPORT
(Basic Information to be filled by Consultant)
To : Head of District, SYABAS District
Consultant :
Name of Development :
File No :
Date :
LV EQUIPMENT PERFORMANCE TEST REPORT
1. SWITCH BOARD
1.1 VISUAL CHECK:
Others : ___________________________________________________________________________________
___________________________________________________________________________________
___________________________________________________________________________________
Comments : ____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
BIL. CHECK DESCRIPTION REMARKS
1. NAME PLATE
2. PART LAYOUT
3. TYPE AND RATING OF EACH DEVICE
4. COMPONENTS ARRANGEMENT
5. GENERAL ASSEMBLY
6. BUSBAR SIZES
7. EARTH BAR SIZES
8. WIRING
9. LABELLING
10. OTHERS
FORM EPS / E 3
PAGE 1/10
DOWNLOAD HERE


Winning is not a sometime thing; it’s an all time thing. You don’t win once in a while, you don’t do things right once in a while, you do them right all the time. Winning is habit. Unfortunately, so is losing. | Vince Lombardi