HTML Preview Construction Inspection page number 1.


State of Wisconsin CONSTRUCTION SITE INSPECTION REPORT
Department of Natural Resources Form 3400-187 (rev. 9/04) Page 1 of 2
dnr.wi.gov
Notice: Use of this specific form is voluntary, but the information contained on this form must be collected and kept by the permittee under s. NR
216.48(4), Wis. Adm. Code, for a construction site covered under the General WPDES Construction Site Storm Water Discharge Permit, Permit
No. WI-0067831-2. This form is provided for the convenience of the permittee to meet the requirements of s. NR 216.48(4), Wis. Adm. Code.
Multiple copies of this form may be made to compile the inspection report.
Inspections of implemented erosion and sediment control best management practices must be performed weekly and within 24 hours after a
precipitation event 0.5 inches or greater which results in runoff.
Weekly written reports of all inspections conducted by or for the permittee must be maintained throughout the period of general permit coverage.
The information maintained in accordance with s. NR 216.48 (4) must be submitted to the Department upon request.
Name of Permittee:
Construction Site Name (Project): Construction Site ID No.:
Location: County:
Contractor: Field Office Phone:
Note: Weekly inspection reports, along with erosion control and stormwater management plans, are required to be
maintained on site and made available upon request.
Date of inspection (mm/dd/yy):
________________
Time of inspection: Start: a.m./p.m.
End: a.m./p.m.
Type of inspection: Weekly Precipitation Event
Other (specify) ____________________________________
Name(s) of individual(s) performing inspection:
Weather:
Description of present phase of construction:
Modifications Required Yes No
Not
Applicable
Comments/Recommendations about the overall effectiveness of the erosion
and sediment control measures.
Note: For each item checked "Yes", complete the follow-up information on
page 2.
Ditch Checks

Erosion Control Plan

Erosion Mat

Grading Practices

Inlet Protection

Mulch

Offsite Sediment

Permanent Seeding

Schedule / Phasing

Silt Fence

Silt Screen

Sod

Stabilized Outlet

Temp. Diversion Channel

Temp. Settling Basin

Temporary Seeding

Tracking Pads

Turbidity Barrier

Other (specify) __________

DOWNLOAD HERE


Long–range planning works best in the short term. | Doug Evelyn