How to draft a Construction Company? An easy way to start completing your document is to download this Construction Company template now!
Every day brings new projects, emails, documents, and task lists, and often it is not that different from the work you have done before. Many of our day-to-day tasks are similar to something we have done before. Don't reinvent the wheel every time you start to work on something new!
Instead, we provide this standardized Construction Company template with text and formatting as a starting point to help professionalize the way you are working. Our private, business and legal document templates are regularly screened by professionals. If time or quality is of the essence, this ready-made template can help you to save time and to focus on the topics that really matter!
Using this document template guarantees you will save time, cost and efforts! It comes in Microsoft Office format, is ready to be tailored to your personal needs. Completing your document has never been easier!
Download this Construction Company template now for your own benefit!
(033) 321-3874 Telegram: IRONSTONE E-Mail-info-birdgroup .nic.in Mines Office: P.O.Thakurani, Via-Barbil-758035 Dist-Keonjhar (Orissa) Tel.No.06767-275218, 275379,276131 FAX No.06767-275530 Telegram:”SHOVELLER”: BARBIL E-Mail – civilomdc gmail.com QUOTATION FOR CONSTRUCTION OF SEPTIC TANK, SOAK PIT AND INSPECTION CHAMBER AT ROIDA Quotation No: OMD/Civil/27R/2013-14 Dated: 15.10.2013 Name Address of the Quotationer : : : SIGNATURE OF ISSUING OFFICER Quotation SIGNATURE OF THE QUOTATIONER 1 Signature of Quotationer with seal THE ORISSA MINERALS DEVELOPMENT COMPANY LIMITED THAKURANI (A GOVT.. Description of job unit Quantity Cum 24.72 Cum 0.72 Cum 1.97 Cum 9.78 Cum 0.98 Kg 92.73 Sqm 10.58 Cum 0.39 Kg 3.11 Supplying brick bats for soak pit Cum 3.25 12 mm cement plaster of mix 1:4 (1 cement: 4 coarse sand) Sqm 59.75 Neat cement punning Sqm 47.79 Nos 5.00 Rmt 30.00 Earth work in excavation by mechanical means (Hydraulic excavator) /manual means over areas including disposal of excavated earth, lead upto 50m and lift upto 1.5m, disposed earth to be levelled and neatly dressed in all kinds of soil Supplying and filling in plinth with local sand under floors, including watering, ramming, consolidating and dressing complete..