Contractor Safety Management Plan

Sponsored Link

  免费模板                                  保存,填空,打印,三步搞定!

点击图片放大 / 点击下面的按钮查看更多图片


Adobe PDF (.pdf)

  • 本文档已通过专业认证
  • 100%可定制
  • 这是一个数字下载 (255.89 kB)
  • 语: English

Sponsored Link
  
ABT 模板评分: 7

无病毒。 扫描软件: Norton safe website

How to draft a Contractor Safety Management Plan? An easy way to start completing your document is to download this Contractor Safety Management Plan template now!

Every day brings new projects, emails, documents, and task lists, and often it is not that different from the work you have done before. Many of our day-to-day tasks are similar to something we have done before. Don't reinvent the wheel every time you start to work on something new!

Instead, we provide this standardized Contractor Safety Management Plan template with text and formatting as a starting point to help professionalize the way you are working. Our private, business and legal document templates are regularly screened by professionals. If time or quality is of the essence, this ready-made template can help you to save time and to focus on the topics that really matter!

Using this document template guarantees you will save time, cost and efforts! It comes in Microsoft Office format, is ready to be tailored to your personal needs. Completing your document has never been easier!

Download this Contractor Safety Management Plan template now for your own benefit!

•Employee files will contain the following: - Record of orientation - Medical acknowledgement - Drug and alcohol acknowledgement Nahanni Construction Safety Management Plan Page 4 of 24 - TDG and WHMIS certificates Disciplinary acknowledgements Driver’s permit (copy) Any trade or safety certificates Supervisors will: Supervisor’s roles and responsibilities for Health and Safety                 Report directly to the project superintended.. It is through the control of hazards that the following can be accomplished: • • • Reduced frequency and severity of accidents Reduced financial costs Reduced human suffering "Hazards Recognition and Control" involves: • • • Determining what hazards are present in the workplace Assessing the level of risk for the hazards identified Implementing strategies to eliminate or reduce the risk involved and monitoring the follow up to ensure the control strategies chosen are implemented Nahanni Construction Safety Management Plan Page 7 of 24 Types of hazards that may be considered: • • • • Chemical - chemical agents in the form of vapors, gases, fumes and mists.. 2 Investigation The following accidents/incidents will be investigated by the employer, immediately after the occurrence, and a written report will be issued: • • • • • • • • • • • Accident causing death or injury requiring medical aid by registered doctor Failure of the hoisting device Structural failure of a permanent or temporary structure Contact with overhead or underground power lines Contact with underground pipelines causing breakage or release of contents Blasting accidents Inadvertent exposure to harmful concentrations of hazardous materials Failure of a confined space entry procedure Failure of a lockout procedure Property damage in excess of 10,000 A near miss which had the potential for causing serious injury or property damage.. Equipment and Rigging • • • • • • • • • • • • Maintenance of crane log books Ready availability of crane load charts an


DISCLAIMER
Nothing on this site shall be considered legal advice and no attorney-client relationship is established.


发表评论。 如果您有任何问题或意见,请随时在下面发布


default user img

相关文件


Sponsored Link

最新文件


新主题 (英语)


新主题


愿得一人心,白首不相离